Success stories: Energy
 |
| Project: |
Shell Qatar Container |
| Location: |
Qatar |
| Industrie: |
Energy |
| Customer: |
Siemens PTD M |
| Project goal: |
Medium voltage station OPSS4 as container solution |
|
Up to now:

 |
Medium voltage switchgear has been installed in buildings |
 |
Delivery of ringle cabinets to the installation site |
Solution:

 |
Complete setup of the cabinets in container |
 |
Delivery of finished unit to installation site: two container of 18x3 m and one container of 6x3 m, they are placed together as one unit onsite. |
|
 |
Benefits / Achievements:

Savings in the project:
 |
Checked and prewired medium voltage switchgear |
 |
Reduced installation and commissioning time |
 |
Quicker availability at installation site |
 |
Building cost reduced |
|
|
|
| SIPLUS RIC at the Munich airport |
 |
| Project: |
SIPLUS RIC at the Airport Munich |
| Location: |
Munich |
| Industrie: |
Energy |
| Customer: |
Siemens PTD |
| Project goal: |
Telecontrol in medium voltage switchgear |
|
Up to now:

 |
The medium voltage switchgear were installed in buildings with heating |
 |
SICAM miniRTU could be used for the telecontrol since no particular environmental conditions were specified |
Solution:

 |
The medium voltage switchgear is installed in containers without heating |
 |
SIPLUS RIC is specified and thus suitable for use in the container for the extended temperature range |
|
 |
Benefits / Achievements:

Savings in the project:
 |
Extended temperature range |
 |
Communications according to IEC 870-5-101 / -104 |
 |
Compact module with integrated power supply and isolated in-/ outputs |
|
|
|
| SMS Messages via Tetra-Funk |
 |
| Project: |
Stadtwerke München |
| Location: |
München |
| Industrie: |
Energy |
| Customer: |
Siemens PG |
| Project goal: |
Broadcast of SMS Messages via Tetra-Funk |
|
Up to now:

 |
One operator has to be present at the control center to handle the alarms from the Teleperm XP stations |
 |
Therefore a second person has to be present (in fact 2 people for 24h a day) to care for the failures on site |
Solution:

 |
The automation station Teleperm XP initiates up to 128 SMS messages |
 |
SIPLUS RIC S7 broadcasts via TETRA-Funk SMS messages to preselected mobiles |
|
 |
Benefits / Achievements:

Savings in the project:
 |
Messages will be processed in SIMATIC-Manager in form of text-files and can easily be altered. |

Savings during operation:
 |
Only one operator necessary, as the SMS messages are broadcast in the whole plant via a mobile to the plant-operator. |
|
|
|
| Wind Farm interfaced to Control Center to ENERCON GmbH |
 |
| Project: |
Tronder Energi, Norwegen |
| Location: |
Wind Farm Valsneset |
| Industrie: |
Wind Energy |
| Customer: |
ENERCON GmbH |
| Project goal: |
Providing Data and Control for local utility |
|
Up to now:

 |
Non-Siemens PLC integrated |
 |
No access for the utility to data or control |
Solution:

 |
SIPLUS RIC APPLICATION, S7-400 based protocol converter |
 |
Standard interface to control unit via IEC 870-5-104 |
 |
Standard TIA-based communication to control center for future enhancements |
|
 |
Benefits / Achievements:

Savings in the project:
 |
Standard configuration of TIA components |
 |
Standard interface according to IEC |

Savings during operation:
 |
Reliable communication, no data lost |
 |
Easily expandable |
|
|
|