
|
|

|
A new project is under way: planning for a complete power distribution system – a wafer, LED or flat panel fab. This means: the system has to be designed not just to meet the needs of today but the future as well. This is the only way you can be sure that cost calculations and construction timetables are kept under control, and expensive re-work is avoided.
We can offer you our support: Totally Integrated Power (TIP), a concept which offers end users, electrical consultants and contractors integrated and coordinated power distribution, from medium voltage to low voltage right down the final socket outlet.
Integrated project planning combines individual components such as medium-voltage switchgear, transformers, low voltage switchgear and feeders to form a comprehensive power distribution system.
Together with power management system you can optimize your building in terms of maintenance expense, power consumption and availability.
|
 |