Hello, Guys.

I am back, ok, my question is the next, in the past version of Step7, when I wanted updates my Db´s, I taked this Db´s of the online version of my layout Step7, and dragged it to my offline version, so I had Db´s with equal values in either versions, in Step7 11 how can i do it?,


Thank you so much. Bye.

Top
  6/27/2012, 4:07 PM
Joined 10/10/2005
Last visit: 5/17/2013
Posts: 796
Rating:
Rated: Outstanding [3.37 out of 5 / rated 27 time(s)]. (27) 
Rated: no ratings [0 out of 5 / rated 0 time(s)]. (0) 

Hello,

there is a FAQ in the internet which was very helpful for me. Please see the following link in this regards.

http://support.automation.siemens.com/WW/view/de/41885693

With best regards
Cicero

Top
  6/27/2012, 5:02 PM
Joined 5/3/2012
Last visit: 4/8/2013
Posts: 67
Rating:
Rated: no ratings [0 out of 5 / rated 0 time(s)]. (0) 
Rated: no ratings [0 out of 5 / rated 0 time(s)]. (0) 

Hello,

The first, Thank you for your answer Cicero.

I have some problem with your post, when I am in online project I can´t copy one DB alone, i have that copy all the program blocks,  also when I open the db, the text into it aren´t similar that offline version, attachment screem, there is other way do copy db online to db ofline, than you.

bye.


Attachment: COPY_ONLINE_TO_OFLINE.JPG  (19 Downloads)

Top
  6/27/2012, 5:13 PM
Joined 5/3/2012
Last visit: 4/8/2013
Posts: 67
Rating:
Rated: no ratings [0 out of 5 / rated 0 time(s)]. (0) 
Rated: no ratings [0 out of 5 / rated 0 time(s)]. (0) 
Hello

I copy offline version of my project too.

thank you. bye.

Attachment: ONLINE.JPG  (15 Downloads)

Top
  6/28/2012, 12:28 PM
Joined 5/3/2012
Last visit: 4/8/2013
Posts: 67
Rating:
Rated: no ratings [0 out of 5 / rated 0 time(s)]. (0) 
Rated: no ratings [0 out of 5 / rated 0 time(s)]. (0) 


This is the way, I find for do copy values db online to values db offline.


Capturing the online values of a DB to reset the start values

You can capture the current values being monitored in an online CPU to become the start

values for a global DB.

● You must have an online connection to the CPU.

● The CPU must be in RUN mode.

● You must have opened the DB in STEP 7.

Use the "Show a snapshot of the monitored values" button to capture the current

values of the selected tags in the DB. You can then copy these values into the "Start

value" column of the DB.

1. In the DB editor, click the "Monitor all tags" button. The "Monitor value" column displays

the current data values.

2. Click the "Show a snapshot of the monitored values" button to display the current values

in the "Snapshot" column.

3. Click the "Monitor all" button to stop monitoring the data in the CPU.

4. Copy a value in the "Snapshot" column for a tag.

–Select a value to be copied.

–Right-click the selected value to display the context menu.

–Select the "Copy" command.

5. Paste the copied value into the corresponding "Start value" column for the tag. (Rightclick

the cell and select "Paste" from the context menu.)

6. Save the project to configure the copied values as the new start values for the DB.

7. Compile and download the DB to the CPU. The DB uses the new start values after the

CPU goes to RUN mode.

Note

The values that are shown in the "Monitor value" column are always copied from the

CPU. STEP 7 does not check whether all values come from the same scan cycle of the

CPU


What are you think?
Top